Project Case Studies


Projects that have proved the benefits of Rooflock systems


Case Study

Cella UK Property, Ipswich

Rooflock

The refurbishment of this 18,000 sqm metal roof required products suitable for winter installation. Rooflock's advanced systems enabled the project to commence during January, and delivered a 12-week programme saving.

Case Study

Rolls Royce, Ansty

Rooflock

The ageing coating on this 14,000sqm roof had begun to fail, and the client needed a dependable refurbishment solution to prepare the building for a forthcoming solar PV installation. The Rooflock system delivered a refined, high‑performance roofing upgrade — creating a resilient, future‑proof platform to maximise the long‑term value of the solar installation.

Case Study

BAE Systems, Broad Oak

Rooflock

As part of its carbon‑reduction strategy, BAE Systems wanted to install a solar PV panel system on a 6,000 sqm metal roof. The roof needed refurbishing prior to the installation of PV panels to ensure it would remain reliable for the full lifespan of the new PV system. The refurbished roof is now fully protected and ready to support BAE Systems’ long‑term renewable energy plans.

Case Study

Hilco Capital

Rooflock

This proactive measure to lengthen the life of the existing metal roof ensured that the costly replacement of the sheets would not be needed. The finish from the sprayed application of Rooflock Twelve HR system is superb.

Case Study

Stagecoach, Manchester (Oldham Bus Depot)

Rooflock

This structure dates back to the 1920s and presented numerous challenges to sympathetically waterproof the gutters and parapets. Over 900 metres of Rooflock Eighteen gutter liner was installed to give Stagecoach a leak free home to over 220 buses.

Case Study

PNB House, London

Rooflock

The flat roof of PNB House, 77 Queen Victoria Street was overlaid with a new insulated roof system, bringing the roof up to current Part L regulations and reducing energy consumption for the occupants.

Case Study

Tyne Tunnel Trading Estate

Rooflock

During the full refurbishment of this 6000sqm warehouse in Tyne Tunnel Trading Estate, Rooflock Twelve HR metal coating was specified for a full encapsulation of the existing metal roof sheets, treating the cut edge corrosion and ensuring the roof continues to perform without costly replacement of the roof sheets.
Rooflock Eighteen gutter liner was also specified for all the gutters due its proven durability and NoWeld simplicity.

Case Study

Blackness Road, Aberdeen

Rooflock

This dilapidations refurbishment project required complete refurbishment of the profiled roof and wall cladding to halt corrosion and degradation. Area: 7000sqm

Case Study

MP 350, Wigan

Rooflock

During the dilapidations refurbishment of this 36,000sqm industrial unit, Rooflock Twelve was specified to the flat roof areas to overlay the failing single ply roof system and give the new tenants peace of mind.

Case Study

Air Canada, Heathrow

Rooflock

This project at Heathrow was undertaken while the building remained occupied and in full use. The new insulated Rooflock Twelve system brought the roof up to current Part L regulations, reducing energy consumption for the occupants.

Case Study

Montague Street, Worthing

Rooflock

As part of the dilapidations refurbishment of this retail unit, Rooflock Twelve was specified to overlay the flat roof areas to give trouble free service to the new tenants, protecting their stock and office areas.

Case Study

Cumberland School

Rooflock

Originally built in 2002 under the PFI scheme, this school is due for handover in 2027, and the current tenant (Education Support (Newham) Ltd) has taken the proactive measure to ensure that the 3000sqm metal roof and gutters remain in good condition and will not deteriorate.

Case Study

Dixons Carphone, Lisburn, Northern Ireland

Rooflock

This 5000m2 standing seam steel roof required full refurbishment and Rooflock Metal Roof coating system was chosen by WPL Consulting LLP (Leeds) for a combination of its performance, aesthetics and cost effectiveness. Additionally, a latent defect insurance policy was provided to give the building owner complete peace of mind for the full warranty duration.

Case Study

Squires Gate Lane, Blackpool

Rooflock

This 1300sqm flat roof had reached the end of its service life and Rooflock Twelve was chosen as part of a full refurbishment of both the flat roof and overclad of the existing asbestos cement roof.

Case Study

St Nicholas Shopping Centre, Aberdeen

Rooflock

Rooflock Twelve Podium Waterproofing System was specified to create a new waterproof base to the paved area.