Case Study

Barrow Hedges School

Education

Barrow Hedges School

Location: London, Borough of Sutton

The Task: The London Borough of Sutton needed a durable waterproofing system to upgrade the current asphalt substrate during the refurbishment of Barrow Hedges Primary School.
As the school was operational throughout, it was essential that the works did not disrupt the day to day running of the school.

The Solution: Rooflock Twelve Waterproofing System was specified. The system is typically applied using the wet-on-wet technique, which is not only quick, but crucially ensures total integration of the embedment layer and top layer, and avoids delamination risks. Installation is quick and for peace of mind comes with warranties of 10 and 20 years. An extremely high performance solution.

The Result

From Start To Finish