The Task: Rooflock Gutter Coating System was specified for this 2000m² warehouse facility in Warrington, Cheshire. The central valley gutters were leaking severely and the client wanted a quick, efficient and long lasting solution to protect their valuable stock. The Solution: Rooflock Gutter Coating System contains fibre reinforcements within the coating, so no additional reinforcement is… more
Read moreThe Task: Rooflock Twelve was specified for this striking new-build Passivhaus in Cheshire. Passivhaus standard is awarded for new build housing which delivers comfort, yet uses little energy for heating and cooling. Heat is recovered and recirculated, so the building needs to reach an airtight standard. This project had a flat roof of 300m² which… more
Read moreThe Task: The London Borough of Sutton needed a durable waterproofing system to upgrade the current asphalt substrate during the refurbishment of Barrow Hedges Primary School. As the school was operational throughout, it was essential that the works did not disrupt the day to day running of the school. The Solution: Rooflock Twelve Waterproofing System was… more
Read moreThe Task: A remedial coating had been applied to this 3400m² metal roof previously. This had now failed with extensive delamination. The Solution: The existing failed roof coating was removed and the Rooflock Twelve HR system applied to the prepared metal substrate. The gutters were cleaned, prepared and waterproofed with Rooflock Gutter system, a reinforced gutter… more
Read moreThe £20m tower, which at 60 metres is the second tallest in the UK, became operational in June 2013 on the 75th anniversary of the airport’s opening.
Read more