Case Study

Waters Headquarters

Commercial

Waters Headquarters

Main Contractor: Vinci Construction

Location: Manchester, Lancashire UK

The Task: This 2100m2 new build Trocal PVC single ply project in Manchester had to be completed in a specific time frame without any delays, which required working in a period of cold weather.  This facility created over 100 job opportunities for the people of Manchester.

The Solution: Fastflow Poly 2 Adhesive was specified to adhere the flat roofing insulation due to its superior adhesion capabilities to the aluminium faced vapour control layer and due to the rapid and consistent cure times of Fastflow Poly 2 Adhesive.  This ensured that the project was completed on time and to budget.